Download editable .docxFill in the blanks after printing, or edit the .docx in Word / Google Docs.

ERP Requirements Checklist

54 starter requirements across 8 process areas. Delete what does not apply, add your own on the blank rows, and rate each one before you send it to vendors.

How to use this checklist

Company
Prepared by
Date
Vendor / partner responding

Financials

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R01Multi-entity general ledger with automatic intercompany eliminations   
R02Multi-currency transactions and revaluation   
R03Dimensions (department, location, class, project) on every transaction   
R04Configurable approval workflows for bills and journal entries   
R05Bank feeds and rules-based bank reconciliation   
R06Close checklist / task management   
R07Recurring and reversing journal entries   
R08Fixed asset register with multiple depreciation books   
R09Budget vs actual by dimension   
R10Audit trail on every record change   
 [____]   

Order to cash

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R11Quotes, sales orders and invoices in one flow   
R12Customer-specific pricing and discounts   
R13Credit limits and credit holds   
R14Recurring / subscription billing   
R15Revenue recognition schedules (ASC 606)   
R16Sales tax calculation (native or connector)   
R17Customer portal or statements by email   
R18Collections dunning and aging   
 [____]   

Procure to pay

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R19Purchase requisitions and purchase orders with approvals   
R20Three-way match (PO, receipt, bill)   
R21Vendor portal or OCR bill capture   
R22Landed cost allocation   
R23ACH / positive pay payment files   
R241099 tracking and e-filing   
 [____]   

Inventory and warehouse

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R25Multi-location inventory with transfers   
R26Lot and serial tracking (forward and backward trace)   
R27Bin locations   
R28Barcode scanning on mobile devices   
R29Cycle counting   
R30Reorder points / demand-based replenishment   
R31Kitting and assemblies   
R32Costing method required (FIFO, average, standard)   
 [____]   

Manufacturing

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R33Multi-level bills of materials with versions   
R34Routings and work centers   
R35Material requirements planning (MRP)   
R36Work orders with labor and machine time capture   
R37Quality checks and non-conformance   
R38Shop-floor data collection   
 [____]   

Projects and services

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R39Project budgets vs actuals   
R40Time and expense entry (mobile)   
R41Milestone, T&M and fixed-fee billing   
R42Resource utilization reporting   
 [____]   

Reporting and analytics

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R43Self-service report writer for finance users   
R44Role-based dashboards   
R45Consolidated financial statements   
R46Scheduled report delivery   
R47Export / connector to BI tools (Excel, Power BI)   
 [____]   

Technical and security

IDRequirementPriority (3/2/1)Vendor answer (S/P/C/R/N)Notes / cost
R48Single sign-on and MFA   
R49Role-based and field-level permissions   
R50Documented REST / SOAP API   
R51Included sandbox environment   
R52SOC 1 / SOC 2 Type II reports   
R53Full data export at contract end   
R54Mobile access   
 [____]   

Scoring summary

MeasureVendor AVendor BVendor C
Must-haves answered S (count)   
Must-haves answered N (disqualifying)   
Requirements needing P or C (count)   
Estimated cost of P and C items   
Weighted score (priority x 2 for S, x 1 for P or C, 0 otherwise)   

Score only what you have seen demonstrated. A "yes" in a written response that the vendor could not show in the demo counts as C.

Free template from ERP Cost Guide. Edit freely for your business.